Answer:
The throughput time was 15.7 Hours
Step-by-step explanation:
Consider the provided information.
A product formula's throughput time is determined by adding the manufacturing process's four steps: system time, inspection time, moving time, and wait time.
Throughput time = Process time + Inspection time + Move time + Queue time
Throughput time = 2.6 + 1.5 + 3.7 + 7.9
Throughput time = 15.7 Hours
Hence, the throughput time was 15.7 Hours