Answer:
a. $675.33
b. $1,943.03
c. $747.26
d. $4,026.05
Explanation:
a. Future Value
Pv = - $450
Pmt = $ 0
p/yr = 1
n = 6
r = 7 %
Fv = ?
With the above parameter available, the future value, Fv is $675.33
b. Future Value
Pv = - $900
Pmt = $ 0
p/yr = 1
n = 10
r = 8 %
Fv = ?
With the above parameter available, the future value, Fv is $1,943.03
c. Principal Amount
Pv = ?
Pmt = $ 0
p/yr = 1
n = 5
r = 6 %
Fv = $1,000
With the above parameter available, the future value, Pv is $747.26
d. Principal Amount
Pv = ?
Pmt = $ 600
p/yr = 1
n = 10
r = 8 %
Fv = $0
With the above parameter available, the future value, Pv is $4,026.05